CMAL Logo

Solarachadh, Dìon is
Leasachadh Aiseagan is Calaidhean

  • English
  • Gàidhlig
  • Dachaigh
  • Naidheachdan
    • Naidheachdan
    • Litir-naidheachd
  • Cò Sinn
    • Aithisg Bliadhnail
    • Dreuchdan Bàna làithreach
    • Saorsa Fiosrachaidh
    • Foillseachadh Fiosrachaidh
    • Gèarr-chunntas Choinneamhan
    • Ar Bòrd
    • Foillseachaidhean
  • Ar n-Obair
    • Duaisean
    • Pròiseactan
  • Aiseagan
    • Aiseagan
    • Fiosrachadh mun Chabhlach
  • Calachan
    • Calachan
    • Làraichean
    • Camarathan-Lìn Beò
    • Fios Làithreach do Mharaichean
    • Obrachaidhean Calaidh
    • Fiachan Calaidh
  • Fios thugainn

Fios gu Maraichean

  • NTM 61/16 Wemyss Bay Ferry Terminal Fender Repair Works

    Mariners are advised of marine activities in relation to fender repairs taking place at Wemyss Bay Ferry Terminal. The works will commence on Tuesday 6th September through to 9th September. Divers fro

  • NTM 60/16 Cancellation of CMAL NTM 58/16 Wemyss Bay Ferry Terminal Cathodic Protection Survey/Testing

    Mariners are advised that the survey/testing works planned at Wemyss Bay Ferry Terminal as detailed in NTM 58/16 have been postponed. A further NTM will be raised when the new dates for the works are

  • NTM 59/16 Viking Festival of Fire, Cairnie’s Quay, Largs

    At 2000hrs Saturday 3 September 2016 the Viking Festival of Fire will take place at Cairnie’s Quay, Largs that weather permitting, will culminate in a fireworks display commencing 2100hrs and lasting

  • NTM 58/16 Wemyss Bay Ferry Terminal Pier Cathodic Protection Survey/Testing

    Mariners are advised that contractor MCPS Limited will be conducting surveys/testing of the cathodic protection system fitted to the pier structure at Wemyss Bay Ferry Terminal, on Thursday 01 Septemb

  • NTM 57/16 Cancellation of NTM 49/16 & NTM 51/16

    Mariners are advised that works reported in NTM/49/16 & NTM/51/16 for dredging at Locharanza Ferry Terminal are now complete. Subsequently, both notices, NTM 49/16 & NTM/51/16 are now cancelle

  • NTM 56/16 Gourock Ferry Terminal Rock Revetment and Shoreline Inspection

    Mariners are advised that an inspection of the rock revetment and shoreline north of Gourock Ferry Terminal, Firth of Clyde will be undertaken on Thursday 18 August 2016. Network Rail Civil Examinatio

  • NTM 55/16 Re-Established Pier Head Lights Largs Ferry Terminal, Firth of Clyde

    Mariners are advised that the pier head lights at Largs Ferry Terminal, Firth of Clyde reported as a temporary outage in NTM 45/16 have been re-established as of 10/08/16. Details are as follows: Loca

  • NTM 54/16 Linkspan Inspections/Assessment 2016 Various Port Locations

    Inspection locations & Dates Mallaig – 12th August Gourock – 15th / 16th August Oban – 17th August Colonsay – 18th August Mariners are advised of linkspan inspections taking place from a small wor

  • NTM 53/16 Lochranza Ferry Terminal Fendering Modification Works

    Mariners are advised of marine activities in relation to fendering modifications at Lochranza Ferry Terminal commencing on Friday 05th August. Coastworks Operations Ltd will have workboat “Challenger

  • NTM 52/16 Brodick Ferry Terminal, Isle of Arran Landing Craft – RED PRINCESS

    Mariners are advised that landing vessel RED PRINCESS will be delivering precast concrete materials to Brodick Pier on Tuesday 9th August. The Master will liaise with the Port Manager and Port Staff t

  • NTM 51/16 Lochranza Ferry Terminal, Isle of Arran Pre/Post Dredge Surveys & Land Based Marine Dredging

    Please note that the Lochranza works reported in previous NTM/49 16 have now been extended for a further 10 days from 29 July 2016. — NTM/49/16 — Mariners are advised of pre & post dredge surv

  • NTM 50/16 Wemyss Bay Ferry Terminal Pier Repair Works

    Mariners are advised, weather permitting, repair works will be carried out to the underside of Wemyss Bay Pier from Monday 1st August – Friday 5th August. CMAL’s contractor, Pegasus Power & Commun

  • NTM 49/16 Lochranza Ferry Terminal, Isle of Arran Pre/Post Dredge Surveys & Land Based Marine Dredging

    Mariners are advised of pre & post dredge surveys and land based marine dredging works which are due to be undertaken at Lochranza Ferry Terminal, Isle of Arran. Works will commence on Monday 18th

  • NTM 48/16 Wemyss Bay Ferry Terminal Work Boat Inspection of Cathodic Protection & Linkspan

    Mariners are advised that weather  permitting, an  inspection  of  the  Marine Cathodic Protection under the pier and linkspan at Wemyss Bay Ferry Terminal, Fiirth of Clyde will be undertaken on Thurs

  • NTM 47/16 Wemyss Bay Ferry Terminal Inspections and Linkspan Painting

    Mariners are advised that pier inspections and minor painting works on the underside of the linkspan at Wemyss Bay Ferry Terminal is due to commence on today’s date, 22 June 2016. The works will be un

  • NTM 46/16 Safety of Navigation within the Harbour and Approaches to Largs Ferry Terminal and, Firth of Clyde

    Mariners are advised that RoRo ferries operating within the final approaches to Largs Ferry Terminal are constrained in their ability to manoeuvre due to the need to navigate the narrow harbour entran

  • NTM 45/16 Pier Head Lights Temporarily off station at Largs Ferry Terminal, Firth of Clyde

    Mariners are advised that the pier head lights at Largs Ferry Terminal, Firth of Clyde have been temporarily removed from station for approximately seven days to enable a replacement column to be inst

  • NTM 44/16 Accuracy of Ferry Slipway AtoN Sector Lights at Claonaig, Cumbrae, Fishnish and Tobermory

    Mariners are advised the aids to navigation sector lanterns established to mark the Ro-Ro ferry slipways at the locations listed below are non-precision sector lanterns with a manufacturers published

  • NTM 43/16 Wemyss Bay Ferry Terminal Linkspan Painting

    Mariners are advised that minor painting works on the underside of the linkspan at Wemyss Bay Ferry Terminal is due to commence on 07 June 2016. It is anticipated the works that will be undertaken fro

  • NTM 42/16 Sound of Kerrera Ferry Slipway Improvement Works Breakwater Temporary Special Light

    Mariners are advised contractor George Leslie Ltd is currently constructing a 40m break water on the south side of the extended Kerrera slipway. To indicate the extent of the works a temporary pole mo

  1. Pages:
  2. «
  3. 1
  4. ...
  5. 27
  6. 28
  7. 29
  8. 30
  9. 31
  10. 32
  11. 33
  12. ...
  13. 38
  14. »

Naidheachdan

  • ►2019
    • Faoilleach
  • ►2015
    • Samhain
    • Dàmhair
    • Sultain
    • Lùnastal
    • Iuchar
    • Ògmhios
    • Cèitean
    • Giblean
    • Màrt
    • Gearran
    • Faoilleach
  • ►2014
    • Dùbhlachd
    • Samhain
    • Dàmhair
    • Sultain
    • Lùnastal
    • Iuchar
    • Màrt

Seòrsaichean

  • Aiseagan
  • Cidheachan is Calaidhean
  • Co-chomhairlean
  • Dreuchdan Bàna làithreach
  • DSC (Dleastanas Sòisealta Corporra)
  • Fios gu Maraichean
  • Leasachadh Ionad Aiseig Phort Ilein
  • Litir-naidheachd
  • Mallaig–Lochboisdale New Vessel
  • Meadhanan
  • MV Gleann Sannaig is MV Gleann Ruasaidh
  • Naidheachdan
  • Nochdte
  • Obair Comasachaidh Shoithichean Ìle
  • Oban 1 Berth Upgrades
  • Obraichean Ionad Aiseig Thiriodh
  • Old Uig Ferry Terminal Building
  • Òrdugh (Co-dhaingneachadh) Ath-ùrachadh Cala
  • Prògram Ionadachaidh Shoithichean Beaga
  • Pròiseactan
  • Reachdas Cala: Port Ilein
  • Soithichean Bathair nan Eilean a Tuath
  • Soithichean Ùra do dh’Ìle
  • Tachartasan

Stòras Mara Cailleanach Earranta

Tha sealbh aig Stòras Mara Cailleanach Earranta air na h-aiseagan, puirt, is calachan agus am bun-structair a tha dhìth airson seirbheis aiseig dheatamach a thabhann air taobh siar na h-Alba is Linne Chluaidh.

© 2024 CMAL Stòras Mara Ceilleanach Earranta. Na còirichean uile glèidhte.

Bòrd na Gàidhlig
DNV - ISO 9001 - Quality System Certification
Cyber Essentials Certified Plus
  • Follow
  • Follow
  • Follow
Privacy and cookies policy

Tha an làrach-lìn seo a’ cleachdadh chriomagan gus d’ fhiosrachadh a mheudachadh fhad ’s a tha thu a’ dèanamh do shlighe timcheall an làraich-lìn. Tha na criomagan a tha air an seòrsachadh mar a bhios riatanach, gan stòradh sa bhrobhsair agad oir tha iad deatamach airson obrachadh bunasach na làraich-lìn. Tha sinn cuideachd a’ cleachdadh chriomagan treas-phàrtaidh a tha gar cuideachadh gu dòigh cleachdaidh air an làraich-lìn seo a thuigsinn agus a mhion-sgrùdadh. Cha tèid na criomagan sin a stòradh sa bhrobhsair agad ach le do chead fhèin. Tha an roghainn agad na criomagan sin a dhiùltadh. Ach dh’fhaodadh ro-aonta a thoirt air falbh bho chuid de na criomagan sin buaidh a thoirt air d’ fhiosrachadh brobhsaidh.

Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}