-
We announce the names for the two new ferries
-
We confirm the total cost of the KC investigation
-
Equipment to be installed 7 January 2024
-
Setting sail for Net Zero—ferries have been converted to accept shore power and will ‘plug-in’ at Aberdeen
-
Latitude 55° 48.395’ N Longitude 005o 29.070’ W WGS 84 Datum WGS 84 Datum