CMAL Logo

Solarachadh, Dìon is
Leasachadh Aiseagan is Calaidhean

  • English
  • Gàidhlig
  • Dachaigh
  • Naidheachdan
    • Naidheachdan
    • Litir-naidheachd
  • Cò Sinn
    • Aithisg Bliadhnail
    • Dreuchdan Bàna làithreach
    • Saorsa Fiosrachaidh
    • Foillseachadh Fiosrachaidh
    • Gèarr-chunntas Choinneamhan
    • Ar Bòrd
    • Foillseachaidhean
  • Ar n-Obair
    • Duaisean
    • Pròiseactan
  • Aiseagan
    • Aiseagan
    • Fiosrachadh mun Chabhlach
  • Calachan
    • Calachan
    • Làraichean
    • Camarathan-Lìn Beò
    • Fios Làithreach do Mharaichean
    • Obrachaidhean Calaidh
    • Fiachan Calaidh
  • Fios thugainn
Aerial view of works at Kennacraig pier

Naidheachdan

  • IVEW: New Islay Vessel Enabling Works project update

    Caledonian Maritime Assets Limited (CMAL) is leading plans to upgrade infrastructure at ferry terminals before the delivery of two new Islay ferries. The upgrades include dredging, strengthening works

  • New Names for Islay Vessels Decided by Public Vote

    The new vessels have been named

  • Help us name the new Islay vessels!

    Voting is now open to help us name the two new vessels…

  • SVRP: Q&A from second public webinar

    Further to our two public webinars held in August 2022 and February 2023, we are hosting a series of in-person public engagement events

  • SVRP: Presentation and slides from public webinar

    We held a public webinar on 2 February to share a further update on the SVRP feasibility studies

  • CONTRACT FINALISED FOR TWO NEW FERRIES FOR THE LITTLE MINCH

    Caledonian Maritime Assets Ltd (CMAL) has confirmed the signing of the Bank Refund Guarantee (BRG) for two new vessels for the Little Minch routes between Uig, Lochmaddy and Tarbert (Harris). Work to

  • MULTI-MILLION-POUND TARBERT (HARRIS) FERRY TERMINAL BUILDING COMPLETED

    The new £1.5million ferry terminal building at Tarbert on the Isle of Harris in the Outer Hebrides opened to the public this week (23 January 2023). Caledonian Maritime Assets Limited (CMAL), which ow

  • SVRP: Second public webinar

    We are hosting a second public webinar to share a further update on the SVRP feasibility studies

  • TWO NEW FERRIES FOR ISLAY REACH NEXT CONSTRUCTION MILESTONE

    The construction of two new ferries for Islay reached key construction milestones this week. The first ferry in the production timeline has had its keel laid, while steel-cutting for the second vessel

  • CONTRACT TO BUILD TWO NEW VESSELS FOR THE LITTLE MINCH SIGNED

    Today at Cemre shipyard in Turkey, CMAL signed the contract to build two new ferries to support the communities at Uig, Lochmaddy and Tarbert (Harris). We now enter into a 20-day period during which t

  • PREFERRED BIDDER NAMED TO BUILD TWO NEW VESSELS FOR LITTLE MINCH

    The preferred bidder has been named for a contract to build two new ferries to support the communities at Uig, Lochmaddy and Tarbert (Harris). Caledonian Maritime Assets Ltd (CMAL) intends to award th

  • TARBERT (HARRIS) FERRY TERMINAL IMPROVEMENTS SCOOP ENGINEERING AWARD

    Improvements to the ferry terminal at Tarbert (Harris) have won a major engineering award – before the full project is even complete. The work, led by Caledonian Maritime Assets Limited (CMAL), has be

  • SVRP: Q&A from virtual public meeting

    We are hosting a second public webinar to share a further update on the SVRP feasibility studies

  • FIRST MAJOR BUILD MILESTONE FOR ISLAY FERRIES

    The construction of two new ferries for Islay is officially underway after the first piece of steel was cut yesterday (3 October 2022). The steel-cutting ceremony took place at Cemre Marin Endustri sh

  • LOCAL COMMUNITY ENCOURAGED TO PROVIDE FEEDBACK ON ISLAY VESSEL PORT ENABLING WORKS

    Caledonian Maritime Assets Limited (CMAL) is encouraging the local community to share their views on proposals for upgrading berth infrastructure as part of the preparations for the new Islay vessels.

  • SVRP: Presentation and slides from public webinar

    A Q&A document has been published following the community meeting

  • IVEW: Exhibition slides and feedback survey

    Following a series of community events to discuss the port enabling works at Colonsay, Kennacraig, Port Askaig and Port Ellen ferry terminals, a digital version of the slides are available to view: Ex

  • IVEW: Community events to share upgrade proposals

    We are hosting a series of community events to share proposals for port enabling works at Colonsay, Kennacraig, Port Askaig and Port Ellen ferry terminals. At the events, our engineers will be joined

  • SVRP: Small Vessel Replacement Programme

    We are hosting a public webinar to share an update on the SVRP feasibility studies

  • SVRP: Public webinar

    We are hosting a public webinar to share an update on the SVRP feasibility studies

  1. Pages:
  2. «
  3. 1
  4. 2
  5. 3
  6. 4
  7. 5
  8. 6
  9. 7
  10. 8
  11. 9
  12. »

Latest news

  • Public events: Learn about our plans for new Mull vessels12 Samhain 2025
  • Work to commence on Cumbrae slipway reconstruction10 Samhain 2025
  • Public vote launched to name seven new vessels for SVRP Phase 17 Samhain 2025
  • MV Hebridean Isles makes her final journey28 Dàmhair 2025
  • Tiree Terminal Works’ detailed design completed as tender process begins23 Dàmhair 2025

Seòrsaichean

  • Aiseagan
  • Arran, Kintyre, and Cumbrae
  • Cidheachan is Calaidhean
  • Co-chomhairlean
  • Dreuchdan Bàna làithreach
  • DSC (Dleastanas Sòisealta Corporra)
  • Fios gu Maraichean
  • Inverclyde
  • Ìre 2 SVRP
  • Kennacraig Traffic Management Plan
  • Litir-naidheachd
  • Mallaig–Lochboisdale New Vessel
  • Meadhanan
  • Naidheachdan
  • Nochdte
  • Northern Isles
  • Oban 1 Berth Upgrades
  • Oban, Mull, and Islay
  • Obraichean Ionad Aiseig Thiriodh
  • Old Uig Ferry Terminal Building
  • Port Infrastructure Supplier Engagement Strategy
  • Pròiseactan
    • Leasachadh Ionad Aiseig Phort Ilein
    • MV Gleann Sannaig is MV Gleann Ruasaidh
    • Òrdugh (Co-dhaingneachadh) Ath-ùrachadh Cala
    • Prògram Ionadachaidh Shoithichean Beaga
    • Reachdas Cala: Port Ilein
    • Soithichean Ùra do dh’Ìle
      • Obair Comasachaidh Shoithichean Ìle
  • Skye, Mallaig, Small Isles
  • Soithichean Bathair nan Eilean a Tuath
  • SVRP Infrastructure Works
  • Tachartasan
  • Uist, Harris, and Lewis

Stòras Mara Cailleanach Earranta

Tha sealbh aig Stòras Mara Cailleanach Earranta air na h-aiseagan, puirt, is calachan agus am bun-structair a tha dhìth airson seirbheis aiseig dheatamach a thabhann air taobh siar na h-Alba is Linne Chluaidh.

© 2024 CMAL Stòras Mara Ceilleanach Earranta. Na còirichean uile glèidhte.

Bòrd na Gàidhlig
DNV - ISO 9001 - Quality System Certification
Cyber Essentials Certified Plus
  • Follow
  • Follow
  • Follow
Privacy and cookies policy

Tha an làrach-lìn seo a’ cleachdadh chriomagan gus d’ fhiosrachadh a mheudachadh fhad ’s a tha thu a’ dèanamh do shlighe timcheall an làraich-lìn. Tha na criomagan a tha air an seòrsachadh mar a bhios riatanach, gan stòradh sa bhrobhsair agad oir tha iad deatamach airson obrachadh bunasach na làraich-lìn. Tha sinn cuideachd a’ cleachdadh chriomagan treas-phàrtaidh a tha gar cuideachadh gu dòigh cleachdaidh air an làraich-lìn seo a thuigsinn agus a mhion-sgrùdadh. Cha tèid na criomagan sin a stòradh sa bhrobhsair agad ach le do chead fhèin. Tha an roghainn agad na criomagan sin a dhiùltadh. Ach dh’fhaodadh ro-aonta a thoirt air falbh bho chuid de na criomagan sin buaidh a thoirt air d’ fhiosrachadh brobhsaidh.

Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}