East Loch Tarbert
- ,
NTM 16/16 Cancellation of NTM 10/16
19 Faoilleach 2016Mariners are advised that East Loch Tarbert, Harris, Sgeir Bhuidhe light A3994.16 has been repaired and the outfit is now displaying to character. Subsequently, NTM 10/16 is now cancelled. Further details can be obtained using the contact details below
Read more - ,
NTM 10/16 East Loch Tarbert, Harris Sgeir Bhuidhe, A3994.16, Light Extinguished
11 Faoilleach 2016Mariners are advised the following AtoN light located on the south shore of East Loch Tarbert, Isle of Harris is extinguished. Details are as follows: Location description : East Loch Tarbert, Sgeir Bhuidhe (A3994.16) Latitude : 57° 53.545′ North (WGS-
Read more - ,
NTM 04/16 East Loch Tarbert, Harris Sgeir Ghlas AtoN Light, A3993, All Sectors Unreliable
5 Faoilleach 2016Mariners are advised that a recent inspection has discovered inaccuracies in all light sectors of Sgeir Ghlas sector navigation light. Following an inspection by NLV Pharos it has been reported the southern (seaward) sectors were all found at 1 degree
Read more - , ,
NTM 54/15 Sgeir Braigh Mor Buoy, East Loch Tarbert, Isle of Harris Buoy Returned to Station
25 Dàmhair 2015With reference to NTM 51/15 mariners are advised that repairs to the mooring gear of the navigation buoy at Braigh Mor, East Loch Tarbert, Isle of Harris are complete and the buoy has been returned to station. The AtoN details are as follows: Location
Read more - , ,
NTM 51/15 Sgeir Braigh Mor Buoy, East Loch Tarbert, Isle of Harris Buoy Removed for Repairs
13 Sultain 2015Mariners are advised that a routine maintenance inspection has identified a critical defect on the mooring gear of the navigation buoy at Braigh Mor, East Loch Tarbert, Isle of Harris. This has required the immediate removal of the buoy and mooring gea
Read more - , ,
NTM 15/15 East Loch Tarbert, Isle of Harris Construction Dive Project
13 Màrt 2015Mariners are advised that dive contractors Lochs Diving Services Ltd will be undertaking surface and diving operations to lay and connect an outfall pipe to the seabed from a position on the south shore opposite Tarbert (Harris) Ferry Terminal. The div
Read more

