CMAL Logo

Solarachadh, Dìon is
Leasachadh Aiseagan is Calaidhean

  • English
  • Gàidhlig
  • Dachaigh
  • Naidheachdan
    • Naidheachdan
    • Litir-naidheachd
  • Cò Sinn
    • Aithisg Bliadhnail
    • Dreuchdan Bàna làithreach
    • Saorsa Fiosrachaidh
    • Foillseachadh Fiosrachaidh
    • Gèarr-chunntas Choinneamhan
    • Ar Bòrd
    • Foillseachaidhean
  • Ar n-Obair
    • Duaisean
    • Pròiseactan
  • Aiseagan
    • Aiseagan
    • Fiosrachadh mun Chabhlach
  • Calachan
    • Calachan
    • Làraichean
    • Camarathan-Lìn Beò
    • Fios Làithreach do Mharaichean
    • Obrachaidhean Calaidh
    • Fiachan Calaidh
  • Fios thugainn

Meadhanan

  • CONTRACT TO BUILD TWO NEW VESSELS FOR THE LITTLE MINCH SIGNED

    Today at Cemre shipyard in Turkey, CMAL signed the contract to build two new ferries to support the communities at Uig, Lochmaddy and Tarbert (Harris). We now enter into a 20-day period during which t

  • PREFERRED BIDDER NAMED TO BUILD TWO NEW VESSELS FOR LITTLE MINCH

    The preferred bidder has been named for a contract to build two new ferries to support the communities at Uig, Lochmaddy and Tarbert (Harris). Caledonian Maritime Assets Ltd (CMAL) intends to award th

  • LOCAL PHARMACY WINS BID FOR FORMER FERRY TERMINAL BUILDING AT BRODICK

    Arran residents will soon benefit from a larger, well equipped local pharmacy as plans are laid for Arran Pharmacy Limited to transform the former terminal building. Caledonian Maritime Assets Limited

  • TARBERT (HARRIS) FERRY TERMINAL IMPROVEMENTS SCOOP ENGINEERING AWARD

    Improvements to the ferry terminal at Tarbert (Harris) have won a major engineering award – before the full project is even complete. The work, led by Caledonian Maritime Assets Limited (CMAL), has be

  • CMAL TO HOST COMMUNITY MEETINGS FOR TWO NEW VESSELS

    Caledonian Maritime Assets Limited (CMAL) is hosting a series of public meetings to update communities in Uig, Lochmaddy and Tarbert (Harris) on the two new vessels being procured for the Little Minch

  • DESIGN CONSULTANT APPOINTED FOR GOUROCK FERRY TERMINAL UPGRADE

    Caledonian Maritime Assets Ltd (CMAL) has appointed engineering firm Mott MacDonald to complete detailed design work for the redevelopment of Gourock Ferry Terminal. The work will establish design req

  • GROUND INVESTIGATION WORK SET TO BEGIN AT FERRY TERMINALS

    A six-week programme of ground investigation works is set to begin from Monday 24 October at Kennacraig, Port Ellen, Port Askaig and Colonsay ferry terminals. Caledonian Maritime Assets Limited (CMAL)

  • LOCHBOISDALE LINKSPAN REPAIRS COMPLETED AHEAD OF SCHEDULE

    Essential repair works on the linkspan at Lochboisdale Ferry Terminal have been completed ahead of schedule on 7 October. The linkspan was closed on 24 September to enable safety critical works to rep

  • FIRST MAJOR BUILD MILESTONE FOR ISLAY FERRIES

    The construction of two new ferries for Islay is officially underway after the first piece of steel was cut yesterday (3 October 2022). The steel-cutting ceremony took place at Cemre Marin Endustri sh

  • STATEMENT FROM CMAL IN RESPONSE TO BBC DISCLOSURE PROGRAMME

    The issues raised by the BBC Disclosure programme, as reported by BBC Scotland today (27 September 2022), make serious and concerning allegations.  The details came to the awareness of the current CMA

  • LOCAL COMMUNITY ENCOURAGED TO PROVIDE FEEDBACK ON ISLAY VESSEL PORT ENABLING WORKS

    Caledonian Maritime Assets Limited (CMAL) is encouraging the local community to share their views on proposals for upgrading berth infrastructure as part of the preparations for the new Islay vessels.

  • LOCHBOISDALE & CASTLEBAY FERRY TERMINAL LINKSPANS TO CLOSE FOR REPAIRS

    The linkspan at Lochboisdale Ferry Terminal will be closed on Saturday 24 September after the 05:45 ferry for two weeks for essential work to replace wire lifting ropes. CalMac Ferries Ltd are urgentl

  • Dual Fuel Ferries: MV Glen Sannox Returns to Port Glasgow

    MV Glen Sannox has returned to Port Glasgow from a brief but essential stay at dry dock in Greenock. The vessel—one of two dual-fuel ferries being built at Ferguson Marine (Port Glasgow) (FMPG)—has sp

  • CMAL TO HOST WEBINAR TO UPDATE COMMUNNITIES ON SVRP

    Caledonian Maritime Assets Limited (CMAL) is hosting a public webinar to update communities on the Small Vessel Replacement Programme (SVRP), which will see the replacement of up to seven small “loch

  • Dual Fuel Ferries: MV Glen Sannox Sets Sail to Milestone Dry-Docking

    MV Glen Sannox has left Port Glasgow, heading down the Clyde for a three-week stay in dry dock in Greenock, where finishing touches will be made to internal systems including its propulsion, and for a

  • COMMUNITY INVITED TO FIND OUT ABOUT PROPOSALS FOR FERRY TERMINAL IMPROVEMENTS

    A series of community events will take place next month to share proposals for port enabling works at Colonsay, Kennacraig, Port Askaig and Port Ellen ferry terminals. Caledonian Maritime Assets Limit

  • Dual Fuel Ferries: First MV Glen Sannox Engine Switched On

    The first emergency diesel generator has been run successfully on MV Glen Sannox, one of two dual fuel vessels being built at Ferguson Marine (Port Glasgow). Read the full update on the Ferguson Marin

  • GASAY FERRY TERMINAL DEVELOPMENT: HAVE YOUR SAY

    Caledonian Maritime Assets Limited (CMAL) is urging the local community to share their views on proposed options for a new ferry terminal for Lochboisdale. The proposals include an improved terminal l

  • PORT ELLEN FERRY TERMINAL DEVELOPMENT: HAVE YOUR SAY

    Caledonian Maritime Assets Limited (CMAL) is inviting the local community to share their opinion on proposed improvements and upgrades at Port Ellen Ferry Terminal. CMAL, which owns the ferry terminal

  • FORMER TERMINAL BUILDING AT BRODICK RETURNS TO MARKET

    Caledonian Maritime Assets Limited (CMAL) is inviting proposals to transform the former terminal building at Brodick, after the original project became unviable. Following the completion of the new fe

  1. Pages:
  2. «
  3. 1
  4. 2
  5. 3
  6. 4
  7. 5
  8. 6
  9. 7
  10. 8
  11. ...
  12. 19
  13. »

Latest news

  • Port Ellen Terminal Development: Licenses Granted21 Dàmhair 2025
  • Kennacraig traffic safety improvements: Frequently asked questions14 Dàmhair 2025
  • Upcoming Traffic Management Improvements at Kennacraig Ferry Terminal2 Dàmhair 2025
  • SVRP Phase 2: Exhibition materials available online29 Sultain 2025
  • Vacancy: Senior Procurement Officer29 Sultain 2025

Seòrsaichean

  • Aiseagan
  • Arran, Kintyre, and Cumbrae
  • Cidheachan is Calaidhean
  • Co-chomhairlean
  • Dreuchdan Bàna làithreach
  • DSC (Dleastanas Sòisealta Corporra)
  • Fios gu Maraichean
  • Inverclyde
  • Ìre 2 SVRP
  • Kennacraig Traffic Management Plan
  • Litir-naidheachd
  • Mallaig–Lochboisdale New Vessel
  • Meadhanan
  • Naidheachdan
  • Nochdte
  • Northern Isles
  • Oban 1 Berth Upgrades
  • Oban, Mull, and Islay
  • Obraichean Ionad Aiseig Thiriodh
  • Old Uig Ferry Terminal Building
  • Port Infrastructure Supplier Engagement Strategy
  • Pròiseactan
    • Leasachadh Ionad Aiseig Phort Ilein
    • MV Gleann Sannaig is MV Gleann Ruasaidh
    • Òrdugh (Co-dhaingneachadh) Ath-ùrachadh Cala
    • Prògram Ionadachaidh Shoithichean Beaga
    • Reachdas Cala: Port Ilein
    • Soithichean Ùra do dh’Ìle
      • Obair Comasachaidh Shoithichean Ìle
  • Skye, Mallaig, Small Isles
  • Soithichean Bathair nan Eilean a Tuath
  • SVRP Infrastructure Works
  • Tachartasan
  • Uist, Harris, and Lewis

Stòras Mara Cailleanach Earranta

Tha sealbh aig Stòras Mara Cailleanach Earranta air na h-aiseagan, puirt, is calachan agus am bun-structair a tha dhìth airson seirbheis aiseig dheatamach a thabhann air taobh siar na h-Alba is Linne Chluaidh.

© 2024 CMAL Stòras Mara Ceilleanach Earranta. Na còirichean uile glèidhte.

Bòrd na Gàidhlig
DNV - ISO 9001 - Quality System Certification
Cyber Essentials Certified Plus
  • Follow
  • Follow
  • Follow
Privacy and cookies policy

Tha an làrach-lìn seo a’ cleachdadh chriomagan gus d’ fhiosrachadh a mheudachadh fhad ’s a tha thu a’ dèanamh do shlighe timcheall an làraich-lìn. Tha na criomagan a tha air an seòrsachadh mar a bhios riatanach, gan stòradh sa bhrobhsair agad oir tha iad deatamach airson obrachadh bunasach na làraich-lìn. Tha sinn cuideachd a’ cleachdadh chriomagan treas-phàrtaidh a tha gar cuideachadh gu dòigh cleachdaidh air an làraich-lìn seo a thuigsinn agus a mhion-sgrùdadh. Cha tèid na criomagan sin a stòradh sa bhrobhsair agad ach le do chead fhèin. Tha an roghainn agad na criomagan sin a dhiùltadh. Ach dh’fhaodadh ro-aonta a thoirt air falbh bho chuid de na criomagan sin buaidh a thoirt air d’ fhiosrachadh brobhsaidh.

Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}