CMAL Logo

Solarachadh, Dìon is
Leasachadh Aiseagan is Calaidhean

  • English
  • Gàidhlig
  • Dachaigh
  • Naidheachdan
    • Naidheachdan
    • Litir-naidheachd
  • Cò Sinn
    • Aithisg Bliadhnail
    • Dreuchdan Bàna làithreach
    • Saorsa Fiosrachaidh
    • Foillseachadh Fiosrachaidh
    • Gèarr-chunntas Choinneamhan
    • Ar Bòrd
    • Foillseachaidhean
  • Ar n-Obair
    • Duaisean
    • Pròiseactan
  • Aiseagan
    • Aiseagan
    • Fiosrachadh mun Chabhlach
  • Calachan
    • Calachan
    • Làraichean
    • Camarathan-Lìn Beò
    • Fios Làithreach do Mharaichean
    • Obrachaidhean Calaidh
    • Fiachan Calaidh
  • Fios thugainn

News

  • NTM 49-20 LOCHBOISDALE FENDER REPAIRS

    Latitude 57º 9.131′ North (WGS-84 datum) Longitude 007º 18.259′ West (WGS-84 datum) Mariners are advised that weather permitting, from 24 August 2020 pier fender repair works will commence at Lochbois

  • NTM 48-20 ARMADALE FERRY TERMINAL PIER DIVE SURVEY

      Latitude 57º 3.905′ North (WGS-84 datum) Longitude 005º 47.932′ West (WGS-84 datum) Mariners are advised that, weather permitting a dive survey of Armadale Ferry Terminal Pier, Isle of Skye wil

  • CMAL HARBOUR PROJECTS BACK ON TRACK

    Caledonian Maritime Assets Ltd (CMAL) has resumed all harbour upgrade and maintenance projects following the Covid-19 lockdown. Work to restart projects began in early June as a phased approach, in li

  • NTM 47/20 PORT ELLEN, ISLAY HARBOUR FILMING

    Latitude 55° 37.514’ North (WGS-84 datum) Longitude 006o 12.234’ West (WGS-84 datum) Mariners are advised that throughout the day of 21 August 2020, filming will be taking place from vessels on the wa

  • NTM 46/20 WEST LOCH TARBERT, CORRAN POINT QG, LIGHT RESTORED

    Mariners are advised the following AtoN light located on West Loch Tarbert, Corran Point, Argyll has been restored to normal operation. Location description West Loch Tarbert, Corran Point Latitude 55

  • NTM 45/20 LOCHALINE FERRY BERTHING AREA DEBRIS REMOVAL

    Latitude 56° 32.223’ North (WGS-84 datum) Longitude 005o 46.497’ West (WGS-84 datum) In continuation of NTM 44/20, mariners are advised a further dive will be undertaken Lochaline Ferry Terminal, Morv

  • NTM 44/20 LOCHALINE FERRY TERMINAL BERTHING AREA DIVE SURVEY

    Latitude 56º 32.223′ North (WGS-84 datum) Longitude 005º 46.497′ West (WGS-84 datum) Further to NTM 23/20, with dredging now completed at Lochaline Ferry Terminal, Morven, mariners are advised a dive

  • NTM 43/20 COLL FERRY TERMINAL LINKSPAN DOLPHIN AND PIER WORKS

    Latitude 56º 36.871′ North (WGS-84 datum) Longitude 006º 31.358′ West (WGS-84 datum) Mariners are advised that from 08 August 2020, contractors George Leslie Ltd will be undertaking works on the links

  • NTM 42/20 TARBERT (HARRIS) FERRY TERMINAL DIVE PROJECTS

    Latitude 57º 53.807′ North (WGS-84 datum) Longitude 006º 76.927′ West (WGS-84 datum) Further to NTM 32-20 mariners are advised that until further notification informing harbour users that works have c

  • NTM 41/20 LOCH EATHARNA ISLE OF COLL PUBLIC MOORINGS REINSTATED

    Latitude 56º 36.998′ North (WGS-84 datum) Longitude 006º 31.084′ West (WGS-84 datum) Mariners are advised CMAL have now reinstated the public moorings in Loch Eatharna, Isle of Coll. Hence, NTM 37/20

  • NTM 40/20 – INNER EAST LOCH TARBERT, ISLE of HARRIS PONTOON AND ATTENUATOR REINSTATEMENT

    Latitude 57º 53.814′ North (WGS-84 datum) Longitude 006º 48.067′ West (WGS-84 datum) Mariners are advised that following the completion of dredging within the inner harbour at East Loch Tarbert, Isle

  • NTM 39/20 CORONAVIRUS (COVID-19) HARBOUR RESTRICTIONS UPDATE

    Coronavirus guidance from the Scottish Government is being updated on a regular basis and this NTM has been revised to reflect the progression of Scotland’s phased approach through and out of the COVI

  • ARDROSSAN PASSENGER ACCESS SYSTEM RETURNS TO FULL SERVICE

    The passenger access system (PAS) at Ardrossan Ferry Terminal has returned to operation following completion of an annual safety and maintenance inspection. Various repairs have been carried out and w

  • NTM 38/20 SCALASAIG PIER, ISLE of COLONSAY LEADING LIGHT RESTORED TO NORMAL

    Mariners are advised the following AtoN leading light located at the head of Scalasaig Pier, Ferry Terminal, Isle of Colonsay has resumed normal operation. Location description:         Colonsay. Scal

  • NTM 37/20 LOCH EATHARNA, ISLE of COLL PUBLIC MOORINGS

    Latitude 56º 36.998′ North (WGS-84 datum) Longitude 006º 31.084′ West (WGS-84 datum) Due to continuing operational challenges persisting from the Covid-19 lockdown, CMAL are currently unable to reinst

  • NTM 36/20 LOCHALINE FERRY TERMINAL DREDGING WORKS

    Latitude 56º 32.223′ North (WGS-84 datum) Longitude 005º 46.497′ West (WGS-84 datum) Mariners are advised that following the end of ferry terminal redevelopment works, from 10 July 2020 contractors wi

  • CMAL PROVIDES ISLAY VESSEL PROJECT UPDATE

    Caledonian Maritime Assets Limited (CMAL) has shared information on the new Islay vessel project with the Islay community to maintain engagement during the Covid-19 restrictions. Two community meeting

  • NTM 35/20 – TIREE FERRY TERMINAL RESUMPTION OF OLD PIER REPAIR WORKS

    Latitude 56º 30.634′ North (WGS-84 datum) Longitude 006º 47.932′ West (WGS-84 datum) Mariners are advised that contractors George Leslie Ltd have recommenced repairs to the ‘old’ pier structure and fe

  • NTM 34/20 LOCHALINE FERRY SLIPWAY CATHODIC PROTECTION REPAIRS

    Latitude 56º 32.223′ North (WGS-84 datum) Longitude 005º 46.497′ West (WGS-84 datum) Mariners are advised that commencing on 06 July 2020 works will be undertaken to repair cathodic protection around

  • NTM 33/20 – GOUROCK FERRY TERMINAL LINKSPAN INSPECTION DIVE PROJECT

    Latitude 55º 57.617′ North (WGS-84 datum) Longitude 004º 48.835′ West (WGS-84 datum) Mariners are advised a dive inspection of the linkspan and supporting structure at Gourock Ferry Terminal, Firth of

  1. Pages:
  2. «
  3. 1
  4. ...
  5. 24
  6. 25
  7. 26
  8. 27
  9. 28
  10. 29
  11. 30
  12. ...
  13. 56
  14. »

Seòrsaichean

  • Aiseagan
  • Arran, Kintyre, and Cumbrae
  • Cidheachan is Calaidhean
  • Co-chomhairlean
  • Dreuchdan Bàna làithreach
  • DSC (Dleastanas Sòisealta Corporra)
  • Fios gu Maraichean
  • Inverclyde
  • Leasachadh Ionad Aiseig Phort Ilein
  • Litir-naidheachd
  • Mallaig–Lochboisdale New Vessel
  • Meadhanan
  • MV Gleann Sannaig is MV Gleann Ruasaidh
  • Naidheachdan
  • Nochdte
  • Northern Isles
  • Obair Comasachaidh Shoithichean Ìle
  • Oban 1 Berth Upgrades
  • Oban, Mull, and Islay
  • Obraichean Ionad Aiseig Thiriodh
  • Old Uig Ferry Terminal Building
  • Òrdugh (Co-dhaingneachadh) Ath-ùrachadh Cala
  • Prògram Ionadachaidh Shoithichean Beaga
  • Pròiseactan
  • Reachdas Cala: Port Ilein
  • Skye, Mallaig, Small Isles
  • Soithichean Bathair nan Eilean a Tuath
  • Soithichean Ùra do dh’Ìle
  • Tachartasan
  • Uist, Harris, and Lewis

Stòras Mara Cailleanach Earranta

Tha sealbh aig Stòras Mara Cailleanach Earranta air na h-aiseagan, puirt, is calachan agus am bun-structair a tha dhìth airson seirbheis aiseig dheatamach a thabhann air taobh siar na h-Alba is Linne Chluaidh.

© 2024 CMAL Stòras Mara Ceilleanach Earranta. Na còirichean uile glèidhte.

Bòrd na Gàidhlig
DNV - ISO 9001 - Quality System Certification
Cyber Essentials Certified Plus
s

Thank you for your patience while we work to restore live and historic port weather data to our website

  • Follow
  • Follow
  • Follow
Privacy and cookies policy

Tha an làrach-lìn seo a’ cleachdadh chriomagan gus d’ fhiosrachadh a mheudachadh fhad ’s a tha thu a’ dèanamh do shlighe timcheall an làraich-lìn. Tha na criomagan a tha air an seòrsachadh mar a bhios riatanach, gan stòradh sa bhrobhsair agad oir tha iad deatamach airson obrachadh bunasach na làraich-lìn. Tha sinn cuideachd a’ cleachdadh chriomagan treas-phàrtaidh a tha gar cuideachadh gu dòigh cleachdaidh air an làraich-lìn seo a thuigsinn agus a mhion-sgrùdadh. Cha tèid na criomagan sin a stòradh sa bhrobhsair agad ach le do chead fhèin. Tha an roghainn agad na criomagan sin a dhiùltadh. Ach dh’fhaodadh ro-aonta a thoirt air falbh bho chuid de na criomagan sin buaidh a thoirt air d’ fhiosrachadh brobhsaidh.

Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}