CMAL Logo

Solarachadh, Dìon is
Leasachadh Aiseagan is Calaidhean

  • English
  • Gàidhlig
  • Dachaigh
  • Naidheachdan
    • Naidheachdan
    • Litir-naidheachd
  • Cò Sinn
    • Aithisg Bliadhnail
    • Dreuchdan Bàna làithreach
    • Saorsa Fiosrachaidh
    • Foillseachadh Fiosrachaidh
    • Gèarr-chunntas Choinneamhan
    • Ar Bòrd
    • Foillseachaidhean
  • Ar n-Obair
    • Duaisean
    • Pròiseactan
  • Aiseagan
    • Aiseagan
    • Fiosrachadh mun Chabhlach
  • Calachan
    • Calachan
    • Làraichean
    • Camarathan-Lìn Beò
    • Fios Làithreach do Mharaichean
    • Obrachaidhean Calaidh
    • Fiachan Calaidh
  • Fios thugainn

Meadhanan

  • CMAL TO HOST PUBLIC EVENTS FOR SKYE TRIANGLE PORT PROPOSALS

    Caledonian Maritime Assets Limited (CMAL) will host a series of public exhibition events to share proposals for construction work at the Skye triangle ports of Tarbert (Harris), Uig and Lochmaddy. The

  • £6 MILLION HARBOUR INVESTMENT PROJECT UNDERWAY AT COLINTRAIVE AND RHUBODACH

    Caledonian Maritime Assets Limited (CMAL) has commenced work on a £6 million harbour investment programme to reconstruct the slipways at Colintraive and Rhubodach and create a larger vehicle queuing a

  • Dual Fuel Ferries: 88-Tonne Fuel Tank Delivered For Scotland’s First LNG Ferry

    A major logistical engineering operation took place on the Clyde today (Friday 14th July) when an 88-tonne liquefied natural gas (LNG) tank was delivered to Ferguson shipyard, marking a significant mi

  • BRODICK FERRY TERMINAL REDEVELOPMENT UPDATE

    • Main site contract will complete on time • Passenger access system delayed Caledonian Maritime Assets Limited (CMAL) has announced that the principal contractor, George Leslie Limited, will complete

  • CMAL awards new Kerrera ferry contract to Shetland boatbuilder

    Caledonian Maritime Assets Ltd (CMAL) has awarded the contract to build a replacement ferry for the island of Kerrera to Malakoff Limited of Lerwick in Shetland. The ferry, which will maintain the lin

  • Dual Fuel Ferries: CMAL Announces Name of First LNG Ferry

    MV GLEN SANNOX has been chosen as the name for Caledonian Maritime Assets Limited’s (CMAL) new dual fuel ferry.

  • CMAL WEMYSS BAY PROJECT SCOOPS RICS AWARD

    Caledonian Maritime Assets Limited (CMAL) has picked up a prestigious RICS Scotland Award in the Infrastructure category for its refurbishment project at Wemyss Bay Ferry Terminal. CMAL received the i

  • Public Invited to Help Name CMAL’s First LNG Ferry

    Caledonian Maritime Assets Ltd (CMAL) has announced a shortlist of names for the first of its two 102 metre dual fuel ferries and is inviting the public to vote for their favourite name. The shortlist

  • CMAL Invites Local Communities to Slipway Public Meeting

    Caledonian Maritime Assets Limited (CMAL) will host a public meeting to update communities on the project to reconstruct the slipways at Colintraive and Rhubodach. Individuals, groups and businesses a

  • CMAL ANNOUNCE PLAN TO HELP REVITALISE SCOTLAND’S NATIVE TONGUE

    Caledonian Maritime Assets Ltd (CMAL) has published a second iteration of its Gaelic Language Plan for the next five years from 2016 to 2021. Gaelic is widely spoken in the communities served by CMAL

  • Local Community Invited to New Dual Fuel Ferry Meeting

    Caledonian Maritime Assets Limited (CMAL) will host a series of public meetings to update communities on the design and build of the new dual fuel vessel for the Skye Triangle route and to discuss har

  • CMAL appoints contractor to build new slipways at Colintraive and Rhubodach

    Caledonian Maritime Assets Limited (CMAL) has awarded a contract to reconstruct the slipways at Colintraive and Rhubodach.  A larger vehicle queuing area will also be created at Colintraive as part of

  • CMAL Shared Project Update on Dual Fuel Ferries

    The construction of two dual fuel ferries is approaching a new project milestone as the first vessel, currently known as Hull 801, nears the 75 per cent steelwork fabrication stage, Caledonian Maritim

  • CMAL Appoints Contractor to Maintain Aids to Navigation System

    Caledonian Maritime Assets Ltd (CMAL) has awarded a contract to Gareloch Support Services (GSS) Ltd to maintain CMAL’s Aid to Navigation systems. The contract includes the inspection, servicing, repai

  • CMAL APPOINTS ENGINEER TO PROGRESS HARBOUR DEVELOPMENT FOR NEW FERRY

    Caledonian Maritime Assets Ltd (CMAL) has awarded a contract to Wallace Stone Consulting Engineers for design development work in advance of the introduction of a new ferry on the ‘Skye Triangle’ in 2

  • CMAL STRENGTHENS TEAM WITH TWO NEW APPOINTMENTS

    Caledonian Maritime Assets Ltd (CMAL), which owns the ferries, ports, harbours and infrastructure necessary for ferry services serving the west coast of Scotland and the Clyde Estuary, has appointed a

  • PORT ELLEN RE-OPENS WITH NEW LINKSPAN

    Port Ellen Ferry Terminal has re-opened after Caledonian Maritime Assets Limited completed essential work to install a new linkspan. Caledonian Maritime Assets Ltd (CMAL), which owns Port Ellen, close

  • Kerrera slipway and breakwater upgrade timelapse

    Caledonian Maritime Assets Limited (CMAL) has completed an upgrade to the ferry berthing facilities for the island of Kerrera. The work, which began in January 2016, included an extension of the slipw

  • Port Ellen temporary closure

    Essential repair work at Port Ellen Ferry Terminal will require ferry operator CalMac to divert all Islay services to Port Askaig for a period of around three weeks. The port’s linkspan is being repla

  • Connecting Kerrera — island link gets £1.7m upgrade

    CMAL’s Ruairidh Campbell explains how improvements to the ferry facilities at Kerrera and Gallanach will have a positive impact on freight, tourism and the island’s community. http://www.cmassets.co.u

  1. Pages:
  2. «
  3. 1
  4. ...
  5. 11
  6. 12
  7. 13
  8. 14
  9. 15
  10. 16
  11. 17
  12. 18
  13. 19
  14. »

Latest news

  • SVRP Infrastructure: Investigation works begin20 Lùnastal 2025
  • MV Isle of Islay completes second sea trials22 Iuchar 2025
  • Vacancy: Senior Procurement Officer16 Ògmhios 2025
  • CMAL Joins Landmark Climate Resilience Agreement to Safeguard Scotland’s Infrastructure13 Ògmhios 2025
  • Vacancy: Trainee Management Accountant6 Ògmhios 2025

Seòrsaichean

  • Aiseagan
  • Arran, Kintyre, and Cumbrae
  • Cidheachan is Calaidhean
  • Co-chomhairlean
  • Dreuchdan Bàna làithreach
  • DSC (Dleastanas Sòisealta Corporra)
  • Fios gu Maraichean
  • Inverclyde
  • Litir-naidheachd
  • Mallaig–Lochboisdale New Vessel
  • Meadhanan
  • Naidheachdan
  • Nochdte
  • Northern Isles
  • Oban 1 Berth Upgrades
  • Oban, Mull, and Islay
  • Obraichean Ionad Aiseig Thiriodh
  • Old Uig Ferry Terminal Building
  • Pròiseactan
    • Leasachadh Ionad Aiseig Phort Ilein
    • MV Gleann Sannaig is MV Gleann Ruasaidh
    • Òrdugh (Co-dhaingneachadh) Ath-ùrachadh Cala
    • Prògram Ionadachaidh Shoithichean Beaga
    • Reachdas Cala: Port Ilein
    • Soithichean Ùra do dh’Ìle
      • Obair Comasachaidh Shoithichean Ìle
  • Skye, Mallaig, Small Isles
  • Soithichean Bathair nan Eilean a Tuath
  • SVRP Infrastructure Works
  • Tachartasan
  • Uist, Harris, and Lewis

Stòras Mara Cailleanach Earranta

Tha sealbh aig Stòras Mara Cailleanach Earranta air na h-aiseagan, puirt, is calachan agus am bun-structair a tha dhìth airson seirbheis aiseig dheatamach a thabhann air taobh siar na h-Alba is Linne Chluaidh.

© 2024 CMAL Stòras Mara Ceilleanach Earranta. Na còirichean uile glèidhte.

Bòrd na Gàidhlig
DNV - ISO 9001 - Quality System Certification
Cyber Essentials Certified Plus
  • Follow
  • Follow
  • Follow
Privacy and cookies policy

Tha an làrach-lìn seo a’ cleachdadh chriomagan gus d’ fhiosrachadh a mheudachadh fhad ’s a tha thu a’ dèanamh do shlighe timcheall an làraich-lìn. Tha na criomagan a tha air an seòrsachadh mar a bhios riatanach, gan stòradh sa bhrobhsair agad oir tha iad deatamach airson obrachadh bunasach na làraich-lìn. Tha sinn cuideachd a’ cleachdadh chriomagan treas-phàrtaidh a tha gar cuideachadh gu dòigh cleachdaidh air an làraich-lìn seo a thuigsinn agus a mhion-sgrùdadh. Cha tèid na criomagan sin a stòradh sa bhrobhsair agad ach le do chead fhèin. Tha an roghainn agad na criomagan sin a dhiùltadh. Ach dh’fhaodadh ro-aonta a thoirt air falbh bho chuid de na criomagan sin buaidh a thoirt air d’ fhiosrachadh brobhsaidh.

Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}