1 17/15

Mariners are advised that from 0600hrs on Tuesday 24th March 2015 works to repair water level monitoring equipment at Gourock Ferry Terminal will be undertaken by representatives from Scottish Environment Protection Agency.

SEPA will be operating from the deck of the linkspan outer lifting dolphin and a small workboat to repair the equipment on the rear of the structure. The SEPA supervisor will maintain a radio watch on VHF channel 16 and 31 and liaise with the Port Manager and skippers of the scheduled ferries to ensure there is no disruption to ferry services.

All vessels navigating in the vicinity of Gourock Ferry Terminal are advised do so with caution and regulate their speed to minimise the effects of wash accordingly.

All works should be completed within 24 hours.

Please click here to download a printable PDF of NTM 17/15 (443kb)

Further information can be obtained using the contact details

David McHardie
Harbour Master
Caledonian Maritime Assets Limited


Categories: Piers and harbours, Uncategorized @gd
Tags: Gourock Ferry Terminal, Repair, SEPA, Water Level Monitoring Equipment