• NTM 70/21 Gourock Bay Acoustic Device Maintenance

    Latitude   55º 57.782’N                                                       Longitude 004º 48.923’W WGS 84 Datum     WGS 84 Datum   Mariners are advised that Partrac Ltd will be undertaking rec

  • NTM 69/21 Largs Ferry Terminal Pier Head Fender Works

    Latitude   55° 47.729’ North Longitude 004° 52.320’ West WGS 84 Datum WGS 84 Datum   Mariners are advised that on 13 September 2021, contractors will undertake works to install fendering on the N

  • NTM 68/21 Armadale Ferry Terminal Pier Boat Step Fender Works

    Latitude   57° 3.881’ North Longitude 005° 53.594’ West WGS 84 Datum WGS 84 Datum   Mariners are advised that on 10 September 2021, contractors will undertake works to install fendering on the se

  • NTM 67/21 Lochboisdale Ferry Terminal Pier Fender Repairs

    Latitude   57° 9.131’ North Longitude 007° 18.259’ West WGS 84 Datum WGS 84 Datum   Mariners are advised that from 13 September 2021, pier fender repair works will commence on the linkspan berth

  • NTM 66/21 Largs Viking Festival Flying Display

    As part of the Largs Viking Festival, weather permitting it is planned to have a Flying Display over Largs Bay, Firth of Clyde on Sunday 5th September 2021. The flying display area straddles the adjoi

  • NTM 65/21 Assets Condition Survey Project – Update 13

    Mariners are advised that CMAL will be conducting an asset condition survey of the facilities at the location listed below that is operated primarily in support of lifeline ferries. The survey will be

  • NTM 64/21 Largs Inner Harbour Dive Project on Ferry MV Loch Shira

    Latitude   55° 47.718’ North Longitude 004° 52.322’ West WGS 84 Datum WGS 84 Datum   Mariners are advised that on 01 September 2021, a dive project will be undertaken on CalMac ferry MV Loch Shir

  • NTM 63/21 Largs Pier Head AtoN Lights Returned to Normal

    With reference to NTM 59/21, mariners are advised that today the following AtoN lights established on Largs Ferry Terminal pier head were refitted and returned to normal operation. Name :    Largs. Pi

  • NTM 62/21 Gallanach Ferry Slipway, Sound of Kerrera Dive Inspection

    Latitude   56º 23.822’N                                                        Longitude 5º 30.636’W WGS 84 Datum                                                                      WGS 84 Datum Mari

  • NTM 61/21 Tarbert (Harris) Alteration to Position and Heights of AtoN Lights

    Mariners are advised that following reconstruction of the pier head of Tarbert Ferry Terminal Pier, East Loch Tarbert, Isle of Harris, the sanctioned positions of the following AtoN lights have been p

  • NTM 60/21 Gourock Bay Acoustic Device Maintenance

    Latitude   55º 57.782’N                                                        Longitude 004º 48.923’W WGS 84 Datum                                                                      WGS 84 Datum Ma

  • NTM 59/21 Largs Pier Head AtoN Lights Temporarily Extinguished

    Mariners are advised that on 12 August 2021, the following AtoN lights established on Largs Ferry Terminal pier head will be temporarily extinguished and removed for off-site essential maintenance.  T

  • NTM 58/21 Armadale Ferry Terminal Pier Fender Repairs

    Latitude   57° 3.903’ North                                                  Longitude 005° 53.637’ West WGS 84 Datum                                                                      WGS 84 Datum

  • NTM 57/21 Gourock Ferry Terminal Bathymetric Survey

    Latitude   55° 57.667’ North                                                Longitude 004° 48.853’ West WGS 84 Datum                                                                      WGS 84 Datum M

  • NTM 56/21 Asset Condition Survey Project – Update 12

    Further to NTM 51/21, mariners are advised that CMAL will be conducting an asset condition survey of the facilities at the location listed below that is operated primarily in support of lifeline ferri

  • NTM 55/21 Largs Ferry Terminal Pier Fender Repairs

    Mariners are advised that repairs to fendering on the outer berth on the west side of Largs Ferry Terminal Pier, Firth of Clyde will commence on 29 July 2021. Works are scheduled to take approximately

  • NTM 54/21 Loch Aline Channel Navigation Buoy Dive Inspections

    Mariners are advised that dive inspections will be conducted today of the navigation buoys established within Loch Aline channel, Sound of Mull, Morven, and of areas near to the ferry terminal pier. W

  • NTM 53/21 Gourock Acoustic Device Maintenance

    Mariners are advised that Partrac Ltd will be undertaking recovery, servicing and redeployment of a seabed mooring frame containing an acoustic measuring device and its mooring arrangement that have b

  • NTM 52/21 Coronavirus (Covid-19) Harbour Restrictions Update July 2021

    Covid-19 pandemic guidance from the Scottish Government is being updated on a regular basis and this NTM has been revised to reflect the progression of Scotland’s phased approach through and out of th

  • NTM 51/21 – ASSET CONDITION SURVEY PROJECT – UPDATE 11

    Further to NTM 14/21, mariners are advised that CMAL will be conducting asset condition surveys of the facilities at the locations listed below that are operated primarily in support of lifeline ferri