Complete NTM 53/17

Latitude 55° 55.393’N Longitude 005° 9.163’W
WGS 84 Datum WGS 84 Datum

 

With reference to NTM 44/17, mariners are advised that contractors Raynesway Construction Ltd will have ‘MV Challenger of Leith’ workboat onsite to install a fender as part of the works to construct the Colintraive temporary slipway.

Weather permitting works have been programmed for 12th & 13th October 2017.

During this time the contractor’s supervisor and Master of the vessel will liaise with the CalMac Harbour Manager and ferry Masters and will monitor VHF channels 12 and 16.

Mariners navigating near to Colintraive Ferry Terminal are advised to maintain a look-out for the workboat, maintain a safe distance and pass at minimum speed to reduce vessel wash.

Further details can be obtained using the contact details below.

David McHardie
Harbour Master

Caledonian Maritime Assets Limited
Municipal Buildings, Fore St.,
Port Glasgow
PA1 4 5EQ
Tel: 01475 749 920
email: info@cmassets.co.uk


Categories: Notice to Mariners
Tags: