Complete

Latitude 55º 57.619′ North (WGS-84 datum)
Longitude 004º 48.857′ West (WGS-84 datum)

 

Mariners are advised that on 04 December 2019, contractors will be continuing repairs of the vessel linkspan at Gourock Ferry Terminal, Firth of Clyde.

Weather permitting, works should be completed within 5-days and will be undertaken from the structure and from workboats. The contractor will maintain a radio watch using VHF radio channels 12 and 16.

During this time the linkspan will remain closed to all vessels and those navigating in the vicinity of Gourock Ferry Terminal are requested to do so with caution, maintain a lookout for the workboats and regulate their speed to minimise the effects of wash.

Further details can be obtained using the contact details below:

David McHardie

Harbour Master
Caledonian Maritime Assets Limited
Municipal Buildings,
Fore St. Port Glasgow
PA1 4 5EQ

Tel: 01475 749 920


Categories: Uncategorized @gd
Tags: