Complete NTM 53/20

Location description Lochaline ferry berthing area
Latitude  56° 32.223’North (WGS-84 datum)
Longitude 005o 46.497’ West (WGS-84 datum)

 

Mariners are advised that further works to remove post-construction debris from the ferry berthing area will be undertaken at Lochaline Ferry Terminal, Morven, on 22 September 2020.

Works will be undertaken by the workboat ‘Laura M’ assisted by a dive team who will operate from the slipway and pier structure. Flag A ‘Diving Operations’ will be displayed at all times when divers are in the water and when displayed the pier will be closed to berthing by all vessels. The Master of the workboat and the dive supervisor will maintain communication as required via VHF radio throughout the period of the works.

Work is expected to be completed within 1-day and will be undertaken between scheduled ferry services to avoid any disruption.

All vessels navigating in the vicinity of Lochaline Ferry Terminal during this time are requested to do so with caution, maintain a lookout for the workboat and A-flag and regulate their speed to minimise the effects of wash accordingly.

Further details can be obtained using the contact details below:

David McHardie

Harbour Master
Caledonian Maritime Assets Limited
Municipal Buildings,
Fore St. Port Glasgow
PA1 4 5EQ

Tel: 01475 749 920

Issued on behalf of the Harbour Master

Caledonian Maritime Assets Limited


Categories: Notice to Mariners
Tags: