Complete NTM 17/22

Mariners are advised that Partrac Ltd will be undertaking recovery, servicing and redeployment of seabed mooring frames containing acoustic measuring devices and their mooring arrangements that have been temporarily established at two locations near to Port Ellen, Isle of Islay. NTM 09/22 refers.

These locations are

ADCP 1          Position 55° 37.634′ N   006° 11.740′ W

ADCP 2          Position 55° 36.411′ N   006° 12.531′ W

Weather permitting works will be conducted on 05 March 2022 supported by a workboat and are scheduled to be completed within 1-day.

During the period of the works the master of the workboat will maintain a radio watch on channel 16 and mariners navigating in the vicinity of the positions stated above are requested to do so with caution, regulate their speed to minimise the effects of wash and stay well clear of the workboat.

Further details can be obtained using the contact details below.

Dan Pitt, email: dpitt@partrac.com / +44 (0)7503959958

Alternatively, please call Partrac Ltd office on +44 (0) 141 266 0212.

 

Issued on behalf of the Harbour Master

Caledonian Maritime Assets Limited

email: operations@cmassets.co.uk


Categories: Notice to Mariners
Tags: