Tiree project steering group

A project has been set up to consider what the potential onshore requirements might be of an offshore wind farm off Tiree.

As the harbour owner and Harbour Authority, CMAL are pleased to contribute to this important exercise

Full details of the consultation can be found on the Argyll and Bute Council website here

News items related to this consultation

NTM 56/12: Reinstatement of Aid to Navigation A4181 Light - Oban Railway Quay Linkspan Dolphin

21 September 2012

Mariners are advised that the bottom light of the following AtoN is now reinstated and fully functional.

Read more »

Winning name for world’s first hybrid ferry announced

17 September 2012

Caledonian Maritime Assets Ltd (CMAL) has announced the winning name for the world’s first hybrid ferry after a two stage competition. There were hundreds of votes entered to name the world’s first sea going roll on roll off vehicle and passenger diesel electric hybrid ferry, but the most popular name by far was Hallaig.

Read more »

NTM 55/12: Aid to Navigation A4181 Light Failure - Oban Railway Quay Linkspan Dolphin

17 September 2012

Mariners are advised that the bottom light of the following AtoN is extinguished.

Read more »

NTM 54/12: Isle of Cumbrae – Ferry Slipway Repair Works

14 September 2012

Mariners are advised that contractor George Leslie Ltd is carrying out concrete and foundation repair works to Isle of Cumbrae ferry slipway.

Read more »