• Port Ellen temporary closure

    Essential repair work at Port Ellen Ferry Terminal will require ferry operator CalMac to divert all Islay services to Port Askaig for a period of around three weeks. The port’s linkspan is being repla

  • Connecting Kerrera — island link gets £1.7m upgrade

    CMAL’s Ruairidh Campbell explains how improvements to the ferry facilities at Kerrera and Gallanach will have a positive impact on freight, tourism and the island’s community. http://www.cmassets.co.u

  • Kerrera slipway and breakwater upgrade completed

    Caledonian Maritime Assets Limited (CMAL) has completed an upgrade to the ferry berthing facilities for the island of Kerrera. The work, which began in January 2016, included an extension of the slipw